Compressed Air System Energy-Reduction Case Study (Part 2)
Let's continue from [ Compressed Air System Energy-Reduction Case Study (Part 1) ] Compressed Air Energy-Reduction Strategy Project Goals and Implementation Following the IAC assessment, FUJIFILM’s maintenance team formulated project goals and an implementation plan that centered on the utilization of existing facility infrastructure and equipment. The team’s implementation strategy was divided into three phases and focused on increasing the system’s storage capacity to handle production peaks and valleys; lowering air compressor operating pressure; repairing system leaks; and ultimately, operating the facility with one compressor. The team’s strategy was also aided by the company’s closure of its Orange Park, Florida, operations. This facility housed a 75 horsepower (HP) air compressor, a dryer, and a receiver, which the Dayton facility incorporated into its efforts. Project success, then, depended on the accomplishment of four specific goals: To increase system redundanc...